GESTIONE ACQUA S.p.A.
Management of the execution of the contract for the installation of a weigh-in/out section, a new waste treatment section for the separation of coarse solids, sand and fine organic material, a new chemical-physical treatment section and a new deodorisation system.
The purpose of the work concerns the direction and technical, accounting and administrative control of the execution, as well as the coordination and supervision of the activities of the entire works management office and the maintenance of relations with the executor regarding the technical and economic aspects of the contract for the revamping of the Frugarolo (AL) purification plant.
Director of Works
August 2024 – October 2025
2.235.288,51 €
Construction Management
Registered office
Via Pasubio, 7
21049 Tradate (VA)
Operating Office
Via Cavour, 2
22074 Lomazzo (CO)
Contacts
Tel: +39 02.367 143 88
Email: info@seam-eng.com
© 2025 Seam Engineering Developed by DkR s.r.l.
Cookie Policy | Privacy Policy
P.IVA / CF: 02878300124 | PEC: seamengineering@pec.seam-eng. com | REA: VA297807 | Share capital: 10.000€