Municipality of Milan – Metropolitana Milanese / MM S.p.A.
Consortium plant
Coordination of safety during execution phase for the substantial modification of the biological and sludge disposal section of the Milan S. Rocco wastewater treatment plant in view of EXPO Milano 2015, with the aim of increasing the purification capacity: increase of approx. 200,000 p.e. for a total of 1,250,000 p.e. of capacity. Flow rate 12,000 m3/h dry weather, 40,000 m3/h rain.
Safety Coordinator in the Execution Phase (CSE)
CSE Assistant with D.Lgs. 81/2008 qualification
Safety Engineer for Documentary Verification
2013 – 2014
7.430.000,00 €
Coordination of safety during the execution of works (CSE).
Registered office
Via Pasubio, 7
21049 Tradate (VA)
Operating Office
Via Cavour, 2
22074 Lomazzo (CO)
Contacts
Tel: +39 02.367 143 88
Email: info@seam-eng.com
© 2025 Seam Engineering Developed by DkR s.r.l.
Cookie Policy | Privacy Policy
P.IVA / CF: 02878300124 | PEC: seamengineering@pec.seam-eng. com | REA: VA297807 | Share capital: 10.000€